Selected Projects

Water, Flood Control Aspen Environmental Group Water, Flood Control Aspen Environmental Group

Alondra Park Multi-benefit Stormwater Capture Project

Aspen is preparing an initial site-specific environmental analysis following the current State CEQA Guidelines Appendix G Checklist to determine if an Addendum to the 2015 Los Angeles County Flood Control District Enhanced Watershed Management Programs (EWMP) Final Environmental Impact Report (Program EIR) is the appropriate CEQA document for the Alondra Park Multi-benefit Stormwater Capture Project.

Read More
Energy, Solar Aspen Environmental Group Energy, Solar Aspen Environmental Group

Stagecoach Solar Project

Aspen Environmental Group is assisting the California State Lands Commission on behalf of Aurora Solar, LLC, a wholly owned subsidiary of Avangrid Renewables, with the environmental permitting and the CEQA documentation for a proposed 200 megawatt (MW) solar photovoltaic facility with up to 200 MW of integrated energy storage on approximately 3,570 acres of land managed by the CSLC, in San Bernardino County, CA.

Read More
Water, Flood Control Aspen Environmental Group Water, Flood Control Aspen Environmental Group

Santa Clara River Levee (SCR-1) Levee Improvement Project

The Ventura County Watershed Protection District (District) proposes to rehabilitate the Santa Clara River levee system upstream of Highway 101 (SCR-1) to meet the levee criteria of both the Federal Emergency Management Agency (FEMA) and U.S. Army Corps of Engineers (USACE), and provide adequate protection from a one percent annual chance (formerly known as 100-year) flood event along the Santa Clara River for approximately 1,400 structures (residential, public, commercial, industrial, and agricultural) located in North Oxnard (El Rio area), Ventura County.

Read More
Industrial, Hazardous Waste Aspen Environmental Group Industrial, Hazardous Waste Aspen Environmental Group

CleanTech Environmental, Inc. Hazardous Waste Facility Permit

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Read More
Water, Flood Control Aspen Environmental Group Water, Flood Control Aspen Environmental Group

Rimforest Storm Drain Project

The Rimforest community is situated in the vicinity of the headwaters of Strawberry Creek. For at least the last thirty years, this community has been experiencing severe erosion and land sliding resulting in significant property loss.

Read More
Water, Flood Control Aspen Environmental Group Water, Flood Control Aspen Environmental Group

Santa Ana River Mainstem Project - Prado Basin and Reach 9

Aspen has provided a variety of environmental services to the USACE for the Santa Ana River Mainstem Project. The Santa Ana River Mainstem Project is a major flood control project spanning 75 miles along the Santa Ana River – from the upper canyon in the San Bernardino Mountains downstream to the Pacific Ocean at Newport Beach.

Read More
Water, Pipeline Aspen Environmental Group Water, Pipeline Aspen Environmental Group

Lincoln Avenue Water Permit Support and Pipeline Repair

Aspen prepared an Environmental Assessment and supporting documents, including a Biological Evaluation/Biological Assessment and Management Indicator Species Report, for the proposed Lincoln Avenue Water Company (LAWC) Project located entirely within the boundaries of the Angeles National Forest.

Read More