Projects

Below are some of our featured projects, refresh the page to see other projects.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Assistance to Counties on the State Renewable Energy and Conservation Planning Grants (RECPG) Program

Aspen was awarded contracts to work on plans and associated environmental clearance for four of the six chosen counties to support renewable energy planning efforts in California.

Devers-Palo Verde No. 2 Transmission Line Project

Aspen prepared a joint EIR/EIS for the Devers–Palo Verde No. 2 Transmission Line Project is a 230-mile, 500-kV electric transmission line routed between Devers Substation in California and Harquahala Generating Substation in Arizona.

Tehachapi Renewable Transmission Project

The Tehachapi Renewable Transmission Project involves construction of a series of transmission system improvements extending from the Tehachapi Wind Resource Area in eastern Kern County to the Los Angeles Basin.

California Valley Solar Ranch

Aspen prepared an EIR for this 250-megawatt solar photovoltaic power plant project on behalf of San Luis Obispo County.

Topaz Solar Farm

Aspen prepared the EIR for the development of a 550-MW solar photovoltaic project. 

Project List:

Select Projects