Projects

Below are some of our featured projects, refresh the page to see other projects.

Antelope Transmission Project, Segments 2 & 3

Aspen prepared a fast-track EIR for Segments 2 and 3 of SCE’s Antelope Transmission Project.

Devers-Palo Verde No. 2 Transmission Line Project

Aspen prepared a joint EIR/EIS for the Devers–Palo Verde No. 2 Transmission Line Project is a 230-mile, 500-kV electric transmission line routed between Devers Substation in California and Harquahala Generating Substation in Arizona.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Alta-Oak Creek Mojave Wind Project

Aspen assisted Kern County with the California Environmental Quality Act process for the Alta-Oak Creek Mojave Project.

Monterey Accelerated Research System Cabled Observatory

Aspen completed a joint EIR/EIS for the California State Lands Commission and the Monterey Bay National Marine Sanctuary on a unique undersea scientific cabled observatory proposed by the Monterey Bay Aquarium Research Institute.

Desert Harvest Solar Project

The Desert Harvest Solar Project will generate 150 megawatts of electricity on an approximately 1,200-acre site managed by the California Desert District of the BLM.

Project List:

Select Projects