Projects

Below are some of our featured projects, refresh the page to see other projects.

Assistance to Counties on the State Renewable Energy and Conservation Planning Grants (RECPG) Program

Aspen was awarded contracts to work on plans and associated environmental clearance for four of the six chosen counties to support renewable energy planning efforts in California.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Littlerock Reservoir Sediment Removal Project

Aspen is under contract to prepare a joint EIS/EIR evaluating the impacts of sediment removal alternatives for the Littlerock Reservoir and Dam on National Forest System lands in Los Angeles County.

Del Sur Solar Project

Aspen prepared an EIR, MMRP, and technical studies (biological resources, cultural resources, noise, and air quality & greenhouse gas) under contract to the City of Lancaster for the Del Sur Solar Project. This fast-tracked EIR was certified just 8 months after project kick-off.

Simulation of Natural Flows in Middle Piru Creek

Under contract to the California DWR, Aspen prepared an EIR for a proposal to change the seasonal flow release schedule of Pyramid Dam, located at the southern end of Pyramid Lake in Los Angeles County, California.

Ormond Beach Wetlands Restoration Feasibility Plan

Aspen managed the preparation the Ormond Beach Wetlands Restoration Feasibility Plan for the California State Coastal Conservancy.

Project List:

Select Projects