Projects

Below are some of our featured projects, refresh the page to see other projects.

Del Sur Solar Project

Aspen prepared an EIR, MMRP, and technical studies (biological resources, cultural resources, noise, and air quality & greenhouse gas) under contract to the City of Lancaster for the Del Sur Solar Project. This fast-tracked EIR was certified just 8 months after project kick-off.

Devers-Palo Verde No. 2 Transmission Line Project

Aspen prepared a joint EIR/EIS for the Devers–Palo Verde No. 2 Transmission Line Project is a 230-mile, 500-kV electric transmission line routed between Devers Substation in California and Harquahala Generating Substation in Arizona.

Desert Harvest Solar Project

The Desert Harvest Solar Project will generate 150 megawatts of electricity on an approximately 1,200-acre site managed by the California Desert District of the BLM.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Desert Renewable Energy Conservation Planning Phase 1

Sunrise Powerlink Project

Aspen prepared an EIR/EIS for this highly controversial project crossing portions of San Diego and Imperial counties in California.

Project List:

Select Projects