Selected Projects

Aspen Environmental Group Aspen Environmental Group

Devers-Palo Verde #2 Transmission Project

The Devers–Palo Verde No. 2 Transmission Line Project is a 230-mile, 500-kilivolt (kV) electric transmission line routed between Devers Substation in California and Harquahala Generating Substation in Arizona, as well as 41.6 miles of new 500-kV transmission line routed between the Devers Substation and the Valley Substation in the Romoland area of Riverside County.

Read More
Energy, Oil and Gas Aspen Environmental Group Energy, Oil and Gas Aspen Environmental Group

Tranquillon Ridge Project

Aspen prepared an EIR for the Santa Barbara County Energy Division on the proposed Plains Exploration and Production Company (PXP) Tranquillon Ridge Project which would involve the development of oil and gas wells from Platform Irene into the Tranquillon Ridge Field located in State waters using extending reach drilling technology.

Read More