Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services Water-related Compliance & Permitting

Project Type: Water Supply

Piru Creek Environmental Review and Permitting Services, Los Angeles County

Under contract to the Department of Water Resources, Aspen prepared an IS/MND and obtained Corps of Engineers (Clean Water Act Section 404), CDFG (Fish and Game Code Section 1602 Streambed Alteration Agreement), RWQCB (Clean Water Act Section 401 Water Quality Certification), SWRCB (Clean Water Act Section 402 General Permit [storm water discharges] compliance), and USFS authorizations to repair three access sites to the California Aqueduct and to seismically retrofit a bridge along Piru Creek. Additional services included preparing a USFS Biological Evaluation/Biological Assessment, a Habitat Mitigation and Monitoring Plan, conducting pre-construction sensitive species surveys, and conducting construction monitoring and worker training. In addition, Aspen assisted the restoration of affected areas by working with construction personnel to install native plants as part of the construction activities.



This project is located on the following Services pages:
Biological Surveys and Impact Assessment
Hydrologic and Hydraulic Modeling and Sediment Transport Studies
Water-related Compliance & Permitting
Services Provided on this Project:
• Environmental Impact Analysis
• Hydrologic/Hydraulic Analysis
• Sediment Transport Analysis
• Biological Studies and Surveys
• Permitting and Regulatory Compliance
• Mitigation Monitoring Plans

TOP :: BACK

© 2007 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED