Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services Power Generation and Energy Infrastructure

Project Type: Energy

Salton Sea Geothermal Power Plant (CEC)

Aspen is assisting the CEC in preparing the Staff Assessment for the Salton Sea Geothermal Power Plant Project, located in Imperial County, which would consist of three small geothermal plants on a 160 acre site, using hot, high pressure geothermal fluid (brine) to produce 159 MW of energy.

This project is located on the following Services pages:
Environmental Impact Assessment
Power Generation and Energy Infrastructure
Air Quality Permitting and Modeling

TOP :: BACK

© 2007 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED