SCE Viejo System Project Initial Study/Mitigated Negative Declaration (IS/MND)
Aspen prepared an IS/MND for SCE's Permit to Construct the Viejo System
Project. This project included construction of a 220/66/12 kilovolt
(kV) substation (Viejo Substation) and a 3.1-mile 66 kV subtransmission
line between the proposed Viejo Substation and the existing Chiquita
Substation. The project would also include the replacement of 19
dual-circuit tubular steel poles with 13 H-frame structures capable of
carrying four 66 kV circuits, and the installation of two optical ground
wires. The Final IS/MND was released in May 2004.
|
|
|
|