PG&E Tri-Valley 2002 Capacity Increase Project

Aspen prepared an EIR for the installation of a 230 kV transmission system, including construction of two new 230 kV substations (in Livermore and Dublin) and 23 miles of 230 kV transmission lines, including 2.5 miles of underground construction. The project was highly controversial in the Tri-Valley area because of PG&E's proposal to install the 230 kV transmission line underground through a residential area.

This project is located on the following Services pages:
Environmental Impact Assessment
Mitigation Monitoring, Compliance, and Reporting
Power Generation and Energy Infrastructure
Biological Surveys and Impact Assessment
Services Provided on this Project:
• Environmental Impact Analysis
• Mitigation Monitoring
• Electromagnetic Fields
• Land Use
• Geology
• EMF and Underground Transmission Issues
• Transmission Planning
• Biology
• Traffic & Transportation
• Water Resources
• Cultural Resources
• Visual Resources
• Public Participation