Services Biological Surveys and Impact Assessment

Project Type: Energy

PG&E Tri-Valley 2002 Capacity Increase Project

Under contract with the CPUC, Aspen prepared a Notice to Proceed with construction for CPUC review and monitored construction of an underground 230 kV transmission line in the south Livermore and Pleasanton areas. The project as approved by CPUC (based on the EIR prepared by Aspen) includes approximately 2.5 miles of 230 kV overhead dual-circuit transmission line, 11.8 miles of underground line, construction of two new 230 kV substations (in Livermore and Dublin), and modification of an existing station (Pleasanton).

This project is located on the following Services pages:
Environmental Impact Assessment
Mitigation Monitoring, Compliance, and Reporting
Power Generation and Energy Infrastructure
Biological Surveys and Impact Assessment
Services Provided on this Project:
• Environmental Impact Analysis
• Mitigation Monitoring
• Electromagnetic Fields
• Land Use
• Geology
• EMF and Underground Transmission Issues
• Transmission Planning
• Biology
• Traffic & Transportation
• Water Resources
• Cultural Resources
• Visual Resources
• Public Participation

TOP :: BACK

© 2007 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED