Projects

Below are some of our featured projects, refresh the page to see other projects.

Ormond Beach Wetlands Restoration Feasibility Plan

Aspen managed the preparation the Ormond Beach Wetlands Restoration Feasibility Plan for the California State Coastal Conservancy.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Alta-Oak Creek Mojave Wind Project

Aspen assisted Kern County with the California Environmental Quality Act process for the Alta-Oak Creek Mojave Project.

Tehachapi Renewable Transmission Project

The Tehachapi Renewable Transmission Project involves construction of a series of transmission system improvements extending from the Tehachapi Wind Resource Area in eastern Kern County to the Los Angeles Basin.

Transpacific Fiber-Optic Cables Project

Aspen is preparing an environmental impact report (EIR) for a project consisting of the installation of four fiber-optic cable systems across the Pacific Ocean.

Del Sur Solar Project

Aspen prepared an EIR, MMRP, and technical studies (biological resources, cultural resources, noise, and air quality & greenhouse gas) under contract to the City of Lancaster for the Del Sur Solar Project. This fast-tracked EIR was certified just 8 months after project kick-off.

Project List:

Select Projects