Simulation of Natural Flows in Middle Piru Creek

Under contract to the California DWR, Aspen prepared an EIR for a proposal to change the seasonal flow release schedule of Pyramid Dam, located at the southern end of Pyramid Lake in Los Angeles County, California.

Transpacific Fiber-Optic Cables Project

Aspen is preparing an environmental impact report (EIR) for a project consisting of the installation of four fiber-optic cable systems across the Pacific Ocean.

Littlerock Reservoir Sediment Removal Project

Aspen is under contract to prepare a joint EIS/EIR evaluating the impacts of sediment removal alternatives for the Littlerock Reservoir and Dam on National Forest System lands in Los Angeles County.

Desert Harvest Solar Project

The Desert Harvest Solar Project will generate 150 megawatts of electricity on an approximately 1,200-acre site managed by the California Desert District of the BLM.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Oil and Gas Well Stimulation Treatments in California

Under contract to the California Department of Conservation (DOC), Aspen prepared a Program Environmental Impact Report (EIR) assessing oil and gas well stimulation treatments throughout California, as required by Section 3161 (b)(3) and (4) of Public Resources Code Chapter 1, Division 3, (Senate Bill 4 [Pavley]), as signed into law on September 20, 2013 and subsequently amended in 2014 by Senate Bill 861.