Projects

Below are some of our featured projects, refresh the page to see other projects.

Antelope Transmission Project, Segments 2 & 3

Aspen prepared a fast-track EIR for Segments 2 and 3 of SCE’s Antelope Transmission Project.

Del Sur Solar Project

Aspen prepared an EIR, MMRP, and technical studies (biological resources, cultural resources, noise, and air quality & greenhouse gas) under contract to the City of Lancaster for the Del Sur Solar Project. This fast-tracked EIR was certified just 8 months after project kick-off.

Simulation of Natural Flows in Middle Piru Creek

Under contract to the California DWR, Aspen prepared an EIR for a proposal to change the seasonal flow release schedule of Pyramid Dam, located at the southern end of Pyramid Lake in Los Angeles County, California.

Antelope-Pardee 500-kV Transmission Project

Aspen prepared a joint EIR/EIS for the construction of a new 25.6-mile 500-kV transmission line in northern Los Angeles County, California.

Beacon Solar Energy Project

Aspen assisted the California Energy Commission from 2008 to 2010 with the Staff Assessment for the Beacon Solar Energy Project.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Project List:

Select Projects