Projects

Below are some of our featured projects, refresh the page to see other projects.

Desert Harvest Solar Project

The Desert Harvest Solar Project will generate 150 megawatts of electricity on an approximately 1,200-acre site managed by the California Desert District of the BLM.

SCE West of Devers Upgrade Project EIR/EIS

Aspen is currently preparing an Environmental Impact Report and Environmental Impact Statement (EIR/EIS) on behalf of the California Public Utilities Commission (CPUC) and the Bureau of Land Management (BLM).

Alta East Wind Project

Aspen is preparing a joint EIS/EIR for the Alta East Wind Project in compliance with the California Environmental Quality Act and the National Environmental Policy Act.

Imperial County Renewable Energy and Transmission Element Update

The County of Imperial was the recipient of a California Energy Commission Grant on July 15, 2013, to update the existing “Geothermal/Alternative Energy & Transmission Element” of the General Plan.

Devers-Palo Verde No. 2 Transmission Line Project

Aspen prepared a joint EIR/EIS for the Devers–Palo Verde No. 2 Transmission Line Project is a 230-mile, 500-kV electric transmission line routed between Devers Substation in California and Harquahala Generating Substation in Arizona.

Geospatial Resource and Asset Sustainability Program

Aspen Environmental Group is implementing a Geospatial Resource and Asset Sustainability Program (GRASP) to maintain an inventory of infrastructure assets and sensitive resources within a utility’s corridor rights-of-way and streamline environmental planning and permit­ting for operation and maintenance (O&M) activities. 

Project List:

Select Projects