Projects

Below are some of our featured projects, refresh the page to see other projects.

Assistance to Counties on the State Renewable Energy and Conservation Planning Grants (RECPG) Program

Aspen was awarded contracts to work on plans and associated environmental clearance for four of the six chosen counties to support renewable energy planning efforts in California.

Imperial County Renewable Energy and Transmission Element Update

The County of Imperial was the recipient of a California Energy Commission Grant on July 15, 2013, to update the existing “Geothermal/Alternative Energy & Transmission Element” of the General Plan.

Devers-Palo Verde No. 2 Transmission Line Project

Aspen prepared a joint EIR/EIS for the Devers–Palo Verde No. 2 Transmission Line Project is a 230-mile, 500-kV electric transmission line routed between Devers Substation in California and Harquahala Generating Substation in Arizona.

Littlerock Reservoir Sediment Removal Project

Aspen is under contract to prepare a joint EIS/EIR evaluating the impacts of sediment removal alternatives for the Littlerock Reservoir and Dam on National Forest System lands in Los Angeles County.

Geospatial Resource and Asset Sustainability Program

Aspen Environmental Group is implementing a Geospatial Resource and Asset Sustainability Program (GRASP) to maintain an inventory of infrastructure assets and sensitive resources within a utility’s corridor rights-of-way and streamline environmental planning and permit­ting for operation and maintenance (O&M) activities. 

SCE West of Devers Upgrade Project EIR/EIS

Aspen is currently preparing an Environmental Impact Report and Environmental Impact Statement (EIR/EIS) on behalf of the California Public Utilities Commission (CPUC) and the Bureau of Land Management (BLM).

Project List:

Select Projects