Projects

Below are some of our featured projects, refresh the page to see other projects.

Canoga Park NEW Elementary School

This elementary school was developed on a parcel of land owned by the non-profit organization New Economics for Women.

Ormond Beach Wetlands Restoration Feasibility Plan

Aspen managed the preparation the Ormond Beach Wetlands Restoration Feasibility Plan for the California State Coastal Conservancy.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Alta East Wind Project

Aspen is preparing a joint EIS/EIR for the Alta East Wind Project in compliance with the California Environmental Quality Act and the National Environmental Policy Act.

Tehachapi Renewable Transmission Project

The Tehachapi Renewable Transmission Project involves construction of a series of transmission system improvements extending from the Tehachapi Wind Resource Area in eastern Kern County to the Los Angeles Basin.

Visible Water Vapor and Thermal Plume Analysis Projects

Aspen has unique expertise in assessing the visual and thermal effects of plumes in the atmosphere. Aspen has conducted visible water vapor and/or thermal plume modeling analyses for over 60 power plant projects, including several thermal solar and geothermal power plant projects.

Select Projects