Projects

Below are some of our featured projects, refresh the page to see other projects.

Piru Creek Erosion Repairs and Pyramid Dam Bridge Seismic Retrofit

Aspen assisted the Department of Water Resources a variety of activities in support of ongoing operation and maintenance of facilities associated with the California Aqueduct.

Air Quality and GHG Emissions Analyses for Power Plants

Aspen assists energy agencies, siting authorities, and project proponents in the study of air quality (AQ) and greenhouse gas (GHG) emissions, and impact analyses for power generating facilities.

Devers-Palo Verde No. 2 Transmission Line Project

Aspen prepared a joint EIR/EIS for the Devers–Palo Verde No. 2 Transmission Line Project is a 230-mile, 500-kV electric transmission line routed between Devers Substation in California and Harquahala Generating Substation in Arizona.

Littlerock Reservoir Sediment Removal Project

Aspen is under contract to prepare a joint EIS/EIR evaluating the impacts of sediment removal alternatives for the Littlerock Reservoir and Dam on National Forest System lands in Los Angeles County.

Tehachapi Renewable Transmission Project

The Tehachapi Renewable Transmission Project involves construction of a series of transmission system improvements extending from the Tehachapi Wind Resource Area in eastern Kern County to the Los Angeles Basin.

CleanTech Hazardous Waste Facility Permit EIR

Aspen completed an Environmental Impact Report in compliance with the California Environmental Quality Act to assist the California Environmental Protection Agency’s Department of Toxic Substances Control in the consideration of a Part B Permit Application for the operation of a hazardous waste storage and treatment facility owned and operated by CleanTech Environmental Inc. (CleanTech).

Select Projects