Aspen VP Susan Lee Part of Independent Panel That Published Report on Huntington Beach Desal Project

Phase 2 imageAspen Vice President Susan Lee, as part of the Independent Scientific Technical Advisory Panel (ISTAP), helped write the Draft Subsurface Intake Feasibility Report (Phase 2) for the Proposed Poseidon Desalination Facility. This report evaluates the different intake methods for the Huntington Beach desalination facility. The public comment period for the report will run through September 10, 2015. The group presented the report’s findings and received comments at a public meeting in Huntington Beach, CA on August 27, 2015.

To read the full report, click here.

To watch a video about the public meeting, click here.